Please enable JavaScript for this site to function properly.
OnePetro
  • Help
  • About us
  • Contact us
Menu
  • Home
  • Journals
  • Conferences
  • Log in / Register

Log in to your subscription

and
Advanced search Show search help
  • Full text
  • Author
  • Company/Institution
  • Publisher
  • Journal
  • Conference
Boolean operators
This OR that
This AND that
This NOT that
Must include "This" and "That"
This That
Must not include "That"
This -That
"This" is optional
This +That
Exact phrase "This That"
"This That"
Grouping
(this AND that) OR (that AND other)
Specifying fields
publisher:"Publisher Name"
author:(Smith OR Jones)

Feeling the Pulse of Drill Cuttings Injection Wells - A Case Study of Simulation, Monitoring and Verification in Alaska

Authors
Quanxin Guo (Advantek International) | Ahmed S. Abou-Sayed (Advantek International) | Harold R. Engel (BP Exploration Alaska Inc.)
DOI
https://doi.org/10.2118/84156-MS
Document ID
SPE-84156-MS
Publisher
Society of Petroleum Engineers
Source
SPE Annual Technical Conference and Exhibition, 5-8 October, Denver, Colorado
Publication Date
2003
Document Type
Conference Paper
Language
English
ISBN
978-1-55563-152-9
Copyright
2003. Society of Petroleum Engineers
Disciplines
5.6.4 Drillstem/Well Testing, 2 Well Completion, 4.6 Natural Gas, 1.8 Formation Damage, 4.2.3 Materials and Corrosion, 5.6.3 Pressure Transient Testing, 1.14 Casing and Cementing, 1.11 Drilling Fluids and Materials, 1.7 Pressure Management, 4.3.4 Scale, 2.2.2 Perforating, 6.5.3 Waste Management, 3 Production and Well Operations, 1.10 Drilling Equipment, 3.2.3 Hydraulic Fracturing Design, Implementation and Optimisation, 1.6 Drilling Operations, 6.5.2 Water use, produced water discharge and disposal
Downloads
0 in the last 30 days
182 since 2007
Show more detail
View rights & permissions
SPE Member Price: USD 9.50
SPE Non-Member Price: USD 28.00

Abstract

In April 1998, a program for continuous deep disposal of drill cuttings and open pit materials was initiated on the North Slope of Alaska. This ongoing injection project is commonly referred to as GNI, standing for Grind and Inject. Accumulated drilling cuttings and mud slurry is injected into a receptive cretaceous soft sandstone in three wells, GNI-1, GNI-2, and GNI-3. Typical operations involve injecting slurry into one of the three wells continuously for a number of days and then switching injection to another well. The average injection rate is approximately 30,000 barrels per day. As of September 30, 2002, project injection has included 12.7×106 barrels of water, 30.9×106 barrels of slurry containing 2.0×106 tons or 2.2×106 cubic yards of excavated frozen reserve pit material and drilling solids and 1.31×106 barrels of fluid from ongoing drilling operations.

Knowledge of the fate of the drilling and open pit materials during injection is paramount to assure the safe sequestration of the materials without harm to the environment. Numerical modeling, well testing (including step rate and pressure falloff testing) as well as logging surveys were performed periodically to assess the disposal wells' operational integrity and to ensure the safe containment of the disposed waste slurry. The great capacity of these injectors highlighted the mechanisms for slurry being accepted by multiple and branched fractures - part of the slurry went to previous fractures during subsequent batch injections. The current paper will emphasize on how to integrate numerical simulations, well testing/monitoring and operational data to estimate storage capacity and to construct a clear representation of what was happening underground during this grind and injection operation. The work has implications on other large drilling waste injection projects worldwide.

Introduction

Early drill sites on the North Slope of Alaska were designed with reserve pits for surface storage of mud and cuttings from drilling operations. In 1993, ARCO agreed to remove the mud and cuttings from all reserve pits. Additionally, ARCO and BP discontinued the practice of storing drilling mud and cuttings in surface reserve pits. These waste streams are now managed as they are generated by way of injection, eliminating the need for surface reserve pits. The estimated total volume of reserve pit mud and cuttings to be managed by this process is over 5 million cubic yards (not including drilling mud and cuttings generated from ongoing drilling operations).

After reviewing disposal options, slurry injection was selected as the preferred disposal technique to remediate the reserve pits. Drill cuttings injection projects have been operated worldwide since early 1990s.1-5 However, these projects were generally small in volume. Feasibility evaluation of large scale injection of oily waste injection in Alaska started in late 1980s.1 This field evaluation test also included a step-rate test, in-situ stress measurements, tilt-meter monitoring of ground surface deflections and a wellbore hydraulic impedance test.1 Approximately 2 million barrels of slurry, containing crude oil, unused frac sands, drilling muds, unset cement and others, had been injected intermittently into this well at the time of the analysis. The injection rate varied from 500 bpd to 4,000 bpd.

The first large scale slurry injection project for the reserve pit closure started in March 1995 on the North Slope of Alaska. A total of 8 million barrels of slurry were injected into this well (well DS 4-19) over two years at approximately 30,000 bpd.6 Injected slurry contained a total of 413,000 cubic yards or 340,00 tons of excavated frozen mud and drill cuttings. This project demonstrated that Grind and Injection (GNI) is an environmentally safe and cost effective method for disposing the mud and drill cuttings resulted from pit closure on the North Slope of Alaska. It should be noted that the terms of DCI (Drill Cuttings Injection) and GNI are used interchangeably throughout this paper.

File Size  895 KBNumber of Pages   9

Other Resources

Looking for more? 

Some of the OnePetro partner societies have developed subject- specific wikis that may help.


 


PetroWiki was initially created from the seven volume  Petroleum Engineering Handbook (PEH) published by the  Society of Petroleum Engineers (SPE).








The SEG Wiki is a useful collection of information for working geophysicists, educators, and students in the field of geophysics. The initial content has been derived from : Robert E. Sheriff's Encyclopedic Dictionary of Applied Geophysics, fourth edition.

  • Home
  • Journals
  • Conferences
  • Copyright © SPE All rights reserved
  • About us
  • Contact us
  • Help
  • Terms of use
  • Publishers
  • Content Coverage
  • Privacy
  Administration log in